Features
The CRKT Signature Hunter Knife features a simple classic fixed blade, with a full-tang blade of 1.4116 stainless steel, high hollow ground and mirror polished to minimize staining and corrosion and to give less resistance while skinning. The blade has friction grooves on the spine and its deep finger choil. The dark-stained bamboo scales are riveted in place with stainless steel rivets. Each knife has a slot at the butt with a hand-tied leather fob.
- Full-bellied skinner with drop point gut hook
- 7.625" overall length
- 3.25-inch full-tang stainless steel blade
- High hollow ground
- Deep finger choil
- Friction grooves on spine
- Bamboo handle with stainless steel rivets
- Fitted leather sheath
- Made from a single piece of 7- to 8-ounce leather
- Tooled / perimeter stitched with burnished edges
Shipping Note: Eligible for shipping to all 50 states. However, due to local New York restrictions, we are unable to ship this product to certain Zip Codes. Please see a list of the restricted Zip Codes here.
Warranty: Limited Lifetime CRKT
Specs
Overall Length | 7.625" |
Weight | 4.5 oz. |
Blade Length | 3.25" |
Blade Thickness | 0.138" |
Blade Material | 1.4116 |
Blade HRC | 55-57 |
Finish | Mirror Polished |
Grind | High Hollow |
Style | Drop Point with Gut Hook |
Edge | Plain |
Handle Material | Bamboo |
Sheath Material | Leather |
In the box:
(1) CRKT 2820 Kuskokwin Kommer Signature Hunter Knife with Leather Sheath
Specs
Overall Length | 7.625" |
Weight | 4.5 oz. |
Blade Length | 3.25" |
Blade Thickness | 0.138" |
Blade Material | 1.4116 |
Blade HRC | 55-57 |
Finish | Mirror Polished |
Grind | High Hollow |
Style | Drop Point with Gut Hook |
Edge | Plain |
Handle Material | Bamboo |
Sheath Material | Leather |
In the box:
(1) CRKT 2820 Kuskokwin Kommer Signature Hunter Knife with Leather Sheath
Sales Stats
- Speed to First Woot:
- 18m 24.558s
Purchaser Experience
Purchaser Seniority
Quantity Breakdown
Percentage of Sales Per Hour
12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
---|
Percentage of Sales Per Day
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|